We do all the work ourselves and our client has one point of contact. Should we come across other pipes that are in the way, we can go under or above them, or move them so that we can continue our work. We often see pipes on work sites and industrial sites that are not mapped properly. That is why we always produce a revised drawing and place signalling tape in the ground, 20 centimetres above the pipe. The risk of damage caused by excavation in the future is thus much reduced.
Testing
During the project, the engineer marks various ‘hold points’. In consultation with the client, we build in checks to ensure the quality of the system.